Work performed last week:

  • Set storm structures and reinforced concrete pipe at the corner of Ironbound Road and Longhill Road
  • Excavated for installation of the fire line on Ironbound Road
  • Continued interior footings and foundation walls in Units A, B and C
  • Continued exteriior and interior walls on Level 1 in Units A and B
  • Continued under-slab plumbing and electrical rough-in in Units A, B and C
  • Poured concrete slab-on grade in Unit A

Note: Areas D & C are the single story section of the school. That includes the gym, cafeteria, kitchen, music, art and fitness rooms. Areas A & B are the 3-story classroom sections.