Work Performed this Week:

  • Formed floor slab and set reinforcing bar at the Unit B2 portal openings
  • Formed the ramp from the Auditeria to the Stage
  • Continued load-bearing masonry walls in Units A2 and C Locker Rooms
  • Continued non-bearing masonry walls in Unit B1
  • Continued structural steel beams, joists, and decking supporting Unit B3
  • Continued above ceiling mechanical, electrical, and plumbing (MEP) rough-in in Units B1 and A1
  • Continued mechanical, electrical, and plumbing wall rough-in in Units B2, A2, and C
  • Continued installation of the underground storm system on the North side of the building near the Gymnasium
  • Set the grease interceptor
  • Continued filling and grading in the East parking lot
  • Staked out the curb in the East parking lot

Note: Areas D & C are the single-story section of the school. That includes the gym, cafeteria, kitchen, music, art, and fitness rooms. Areas A & B are the 3-story classroom sections.