8/4/17 – Construction Update

Work Performed this Week:

  • Completed stone subbase in the East parking lot
  • Completed load-bearing masonry in Unit A2
  • Continued load-bearing masonry walls in Units C and D in music, locker rooms and stage
  • Completed elevated deck preparations in Unit B3
  • Completed the spray-applied polyurethane foam (SPF) mockup at the sample panel
  • Continued the 10-gauge metal framing at the window openings in Unit B
  • Installed masonry flashing at the base of the walls in Unit B
  • Installed window head flashing in Unit B
  • Continued above ceiling electrical rough-in in Units B1 and A1
  • Continued ductwork in Units B1 and A1
  • Began rough-grading in the ball field
  • Installed the metal stair pans in Classroom stair tower

Note: Areas D & C are the single-story section of the school. That includes the gym, cafeteria, kitchen, music, art, and fitness rooms. Areas A & B are the 3-story classroom sections.