7/18/2017 – Construction Update

Work Performed this Week:

  • Continued structural steel, joists, and decking in Unit A3
  • Continued load-bearing masonry in Units B3, C, and D
  • Continued mechanical, electrical, and plumbing wall rough-in as masonry work progresses
  • Continued hanging ductwork in Units B1, A1, and B2
  • Continued chilled water piping in Unit A1
  • Continued foundation brick and masonry flashing in Unit B
  • Began SPF insulation in Unit B
  • Continued installation of the gymnasium roof
  • Continued grading and placed stone subbase along the access road between the bus loop and Central Office parking lot
  • Installed concrete curb in the East parking lot
  • Backfilled the new curb in the East parking lot

Note: Areas D & C are the single-story section of the school. That includes the gym, cafeteria, kitchen, music, art, and fitness rooms. Areas A & B are the 3-story classroom sections.