11/17/2017 – Construction Update

Work Performed this Week:

  • Continued structural steel, joists, and roof decking in Units B, A, C, and D
  • Continued exterior parapet framing in Unit B
  • Framed the West exterior wall in Unit A3
  • Continued load-bearing masonry in Unit C
  • Continued exterior brick veneer in Unit B
  • Set windows in the Unit B1 classrooms
  • Continued installing sprinkler pipe in Unit B3
  • Continued mechanical, electrical, and plumbing wall rough-in as masonry work progressed
  • Continued hanging ductwork in Units B and A
  • Formed and pour equipment pads
  • Set mechanical equipment on the equipment pads in the mechanical room
  • Continued above ceiling mechanical piping in Unit B3
  • Continued drain, waste, and vent piping in Unit A3
  • Set the roof drains in Unit A
  • Continued electrical above ceiling rough-in in Units B and A
  • Connected the rain leaders from Units A and D to the storm structures
  • Drilled the underground electrical service line conduit from the existing transformer at the Annex toward the new school

Note: Areas D & C are the single-story section of the school. That includes the gym, cafeteria, kitchen, music, art, and fitness rooms. Areas A & B are the 3-story classroom sections.