3/26/2018 – Construction Update

Work Performed this Week: Continued interior CMU and brick…
Student entrance canopy

3/12/2018 – Construction Update

Work Performed this Week: Continued interior brick in…
Stair AS-3

2/19/2018 – Construction Update

Work Performed this Week: Continued brickwork on the West…

3/5/2018 – Construction Update

Work Performed this Week: Resumed interior brick in Unit…

2/2/2018 – Construction Update

Work Performed this Week: Continued brickwork on the West…
South elevation of the theater classroom and art room noting brickwork along the base of the walls, and exterior framing, sheathing, and spray foam insulation at the high wall

1/26/2018 – Construction Update

Work Performed this Week: Poured concrete treads and landings…

2/12/2018 – Construction Update

Work Performed this Week: Continued brickwork on the West…

1/12/2018 – Construction Update

Work Performed this Week: Excavated and poured column…
East elevation of Unit A showing the exterior CMU walls in the administrative space and exterior framing in the research commons

12/22/2017 – Construction Update

Work Performed this Week: Continued structural steel,…
Stair BS-2 handrails were installed allowing removal of the temporary stairs to the right. This is located at the end of classroom wing by bus loop.

12/15/2017 – Construction Update

Work Performed this Week: Continued structural steel,…