Work Performed this Week:

  • Continued interior CMU pointing and patching 
  • Continued window framing and glazing in the research commons 
  • Continued installing exterior composite metal panels 
  • Continued hanging and finishing gypsum board in administration and auditeria 
  • Applied final coat of paint in Unit AB3 
  • Continued rubber floor tile in Unit AB3 
  • Continued placing and polishing terrazzo flooring 
  • Continued hanging Marlite wood panels in the auditeria and began in Unit A 
  • Continued electrical work in food services 
  • Continued installing ductwork and mechanical pipe in Units C and D 
  • Continued mechanical pipe and controls to the air handling units 
  • Installed equipment racks in the IT closets 
  • Continued fine grading the ball field 
  • Installed the Cooley Field scoreboard 